Oakmere – Chester Road

Oakmere – Chester Road

This project is an excellent example of how load bearing Light gauge Steel Frame can be used to great effect in domestic housing.  The benefits of speed of build and factory-built accuracy ensured that this difficult project went to plan.

The site was tight and made access difficult – the working windows for erecting the frames were equally tight with whole units being built over weekend periods on occasion to facilitate and assist programme.

Panelised roof system provided weather tight habitable space immediately upon install. The designs were enhanced rather than compromised by the use of the Frameclad Load Bearing systems.

Now fully occupied these units provide excellent example of how to build housing with Light Gauge Steel Frame using the Offsite full panel system.

Product: load bearing systems – walls, floors and roof
Site: Oakmere – Chester Road
Main Contractor: Tekbuild
Client: EBL
Materials:
Area: 2500m²
Floors: 3
Status: Complete

Frameclad Chester Road Case Study 1
Frameclad Chester Road Case Study 2
Frameclad Chester Road Case Study 3

Case Studies

Concord Street

Concord Street, Leeds Concord Street is an exciting new build 9 storey apartment block in central Leeds. 35 apartments with a mix of 1 and 2-bed accommodation procured through modern, off-site construction via Frameclad.

A very challenging site has led the design team to look at minimising time and construction activities onsite and through a full BIM approach, the coordination of architecture, structures and Frameclad has allowed careful and detailed positioning options to be looked at.

Photo 14 11 2018 13 25 24 4 Concord Street Frameclad

Overslade House

Northampton This technically challenging project involved the initial removal of a traditional pitched roof from a four story 1980’s Social Housing Accommodation Block and the subsequent installation of two new load-bearing stories plus the associated supporting Hot Rolled Steel grillage, new external lift shaft and associated landing areas.

Screen Shot 2020 04 16 at 21.30.58 5 Overslade House Frameclad