You should also consider replacing this text with something that describes modular solutions but in greater detail. You should also consider replacing this text with something that describes modular solutions but in greater detail. You should also consider replacing this text with something that describes modular solutions but in greater detail.
You should also consider replacing this text with something that describes modular solutions but in greater detail. You should also consider replacing this text with something that describes modular solutions but in greater detail.
You should also consider replacing this text with something that describes modular solutions, bu tin greater detail.
Case Studies
Overslade House
Northampton This technically challenging project involved the initial removal of a traditional pitched roof from a four story 1980’s Social Housing Accommodation Block and the subsequent installation of two new load-bearing stories plus the associated supporting Hot Rolled Steel grillage, new external lift shaft and associated landing areas.
Bath Lane
Bath Lane The project includes the construction of a 601 bedroom student accommodation development, including ancillary management and communal facilities and ground floor commercial units. The project includes the provision of associated parking, highway improvement work, amenity space and landscaping.
Case Studies
Concord Street
Concord Street, Leeds Concord Street is an exciting new build 9 storey apartment block in central Leeds. 35 apartments with a mix of 1 and 2-bed accommodation procured through modern, off-site construction via Frameclad.
A very challenging site has led the design team to look at minimising time and construction activities onsite and through a full BIM approach, the coordination of architecture, structures and Frameclad has allowed careful and detailed positioning options to be looked at.
Canterbury Road
Frameclad manufactured all of the internal/external frames for these two interlinked block five-storey residential development. Floors were constructed from lattice joists and also balcony cassettes were supplied to sit inside a hot rolled frame. Access was limited and due to the busy site location deliveries had to be carefully coordinated and time slots hit.