Project
The Think on Top of the Box project saw the conversion of an existing three storey concrete frame building into nine high-quality, modern townhouses.
Sector
The Think on Top of the Box project saw the conversion of an existing three storey concrete frame building into nine high-quality, modern townhouses. Frameclad were appointed to supply the SFS infill to form new external walls to the existing levels. The project also required the installation of a brand new self-supporting top storey using a steel frame system to increase the total floor space.
Located in a coastal area, this conversion from concrete frame building into exquisite riverside townhouses outlined strict specifications that required precision and expert delivery. A Frameclad steel frame system (SFS) was the ideal choice for the development.
More projects
Located in a busy suburb of Reading, the scheme preserves the three ground floor retail units and will deliver nine one bedroom and five two-bedroom apartments. There will be 10 carparking spaces, including two disabled bays and six EV charging points
With 415 en-suite rooms and 47 studios, The Tannery is a student accommodation scheme located just a short walk from De Montfort University and Leicester city centre.





