Red Bracket

Think On Top Of The Box

THINK ON TOP OF THE BOX

Accommodation

The Think on Top of the Box project saw the conversion of an existing three storey concrete frame building into nine high-quality, modern townhouses. Frameclad were appointed to supply the SFS infill to form new external walls to the existing levels. The project also required the installation of a brand new self-supporting top storey using a steel frame system to increase the total floor space.

Located in a coastal area, this conversion from concrete frame building into exquisite riverside townhouses outlined strict specifications that required precision and expert delivery. A Frameclad steel frame system (SFS) was the ideal choice for the development.

PRODUCT: Load bearing frames & SFS infil

SITE: Coastal Location

MATERIALS 70mm, 150mm and 200mm sections

AREA: 2000m²

FLOORS: 3

STATUS: Complete

Think On Top Of The Box
2
1

Case Studies

Oakmere – Chester Road

Oakmere OAKMERE Chester Road This project is an excellent example of how loadbearing light steel framing can be used to great effect in residential housing. Frameclad…

Wembley Point

Wembley Point WEMBLEY POINT Residential This prestigious project involved a full refurbishment of a reinforced concrete structure. Frameclad provided innovative light steel framing solutions to overcome…

Frameclad Wembley Point BuildTherm