Red Bracket

Windsor House, Sutton

Windsor House, Sutton

In the heart of contemporary Sutton, surrounded by immense culture and diversity, we are delighted to introduce striking new apartments providing the brightest and lightest homes available on a Shared Ownership Scheme. Windsor House is the newest development undertaken by Optivo, giving potential residents the opportunity to live in the desirable and sought after Borough of Sutton.

Optivo is proud to present 27 new homes within this beautiful building. Upper floors of residential space compromising of eight 1-bedroom apartments, sixteen 2 bedroom apartments and three 3-bedroom apartments finished to exceptionally high standards and perfection. Each apartment is designed to complement the ultra-modern architecture favoured in today’s interior designs. Frameclad manufactured all of the internal/external frames for this six-storey residential development.

Constructed from a precast concrete podium the five additional levels were constructed from prefabricated panels with a minimal hot rolled requirement. Another tight access site with one unloading bay and due to its busy site location deliveries had to be carefully coordinated and time slots adhered to.

Product: Assembled Frame SFS – Lattice joist floors and cassette roof
Site: Windsor House, Sutton
Main Contractor: Providence
Client: Optivo Homes
Materials: Load Bearing SFS
Area: 8300m²
Floors: 5 Floors
Status: Complete

Photo 14 11 2018, 13 25 24
Photo 14 11 2018, 13 25 24 1
Photo 14 11 2018, 13 25 24

Case Studies

Canterbury Road

Frameclad manufactured all of the internal/external frames for these two interlinked block five-storey residential development. Floors were constructed from lattice joists and also balcony cassettes were supplied to sit inside a hot rolled frame. Access was limited and due to the busy site location deliveries had to be carefully coordinated and time slots hit.

3 Canterbury Road Frameclad

Bath Lane

Bath Lane The project includes the construction of a 601 bedroom student accommodation development, including ancillary management and communal facilities and ground floor commercial units. The project includes the provision of associated parking, highway improvement work, amenity space and landscaping.

Screen Shot 2020 04 16 at 21.30.58 4 Bath Lane Frameclad