Red Bracket

Windsor House, Sutton

Windsor House, Sutton

In the heart of contemporary Sutton, surrounded by immense culture and diversity, we are delighted to introduce striking new apartments providing the brightest and lightest homes available on a Shared Ownership Scheme. Windsor House is the newest development undertaken by Optivo, giving potential residents the opportunity to live in the desirable and sought after Borough of Sutton.

Optivo is proud to present 27 new homes within this beautiful building. Upper floors of residential space compromising of eight 1-bedroom apartments, sixteen 2 bedroom apartments and three 3-bedroom apartments finished to exceptionally high standards and perfection. Each apartment is designed to complement the ultra-modern architecture favoured in today’s interior designs. Frameclad manufactured all of the internal/external frames for this six-storey residential development.

Constructed from a precast concrete podium the five additional levels were constructed from prefabricated panels with a minimal hot rolled requirement. Another tight access site with one unloading bay and due to its busy site location deliveries had to be carefully coordinated and time slots adhered to.

Product: Assembled Frame SFS – Lattice joist floors and cassette roof
Site: Windsor House, Sutton
Main Contractor: Providence
Client: Optivo Homes
Materials: Load Bearing SFS
Area: 8300m²
Floors: 5 Floors
Status: Complete

Photo 14 11 2018, 13 25 24
Photo 14 11 2018, 13 25 24 1
Photo 14 11 2018, 13 25 24

Case Studies

Abbotts Site

Abbotts Site Abbotts Site, Dartford Knight Frank, in conjunction with Weston Homes, is set to launch Langley Square, a mixed use residential development in the highly…

langley dev 1 Abbotts Site Frameclad

Overslade House

Northampton This technically challenging project involved the initial removal of a traditional pitched roof from a four story 1980’s Social Housing Accommodation Block and the subsequent installation of two new load-bearing stories plus the associated supporting Hot Rolled Steel grillage, new external lift shaft and associated landing areas.

Screen Shot 2020 04 16 at 21.30.58 5 Overslade House Frameclad