This prestigious project sits just off the North Circular in the shadow of Wembley.  It towers high above all around it and places an imposing mark on the sky line.  This is a full refurbishment of a reinforced concrete structure.  All existing external walls were removed and replaced – along with infill floor sections – to the whole of the building.

Frameclad employed a number of specialist techniques to deal with the inconsistency of the existing build – As Built information was sometimes difficult to come by and slightly inaccurate – however, the build went tremendously well and both specialist installer partner Buildtherm and the client RGB are delighted with the results.

Infill extensions to the concrete floors were a particular challenge.

There are plans to introduce further structural amendments to the penthouse – Frameclad and the project developers are looking at options to make this a reality.

Product: Stud and Track and floor infil section
Main Contractor: Buildtherm
Client:
Materials: 75mm,100mm and 150mm
Area: 8000m²
Floors: 20 floors
Status: On site

Frameclad Wembely Point BuildTherm (1)
Frameclad Wembely Point BuildTherm 1 Wembley Point Frameclad
Play Video

Case Studies

Steel Over Timber

A superior alternative to a timber frame. The developer needed an alternative to timber frame to prevent costly delays and increased on-site costs, light steel framing was the solution.

Lighter, quicker and more stable LSF delivered these apartments on time and to budget whilst exceeding the client’s requirements

1 8 Steel Over Timber Frameclad

Bath Lane

Bath Lane The project includes the construction of a 601 bedroom student accommodation development, including ancillary management and communal facilities and ground floor commercial units. The project includes the provision of associated parking, highway improvement work, amenity space and landscaping.

Screen Shot 2020 04 16 at 21.30.58 4 Bath Lane Frameclad