Green Dark Bracket

Modular Solutions

Replace this text with something that describes modular solutions

You should also consider replacing this text with something that describes modular solutions but in greater detail. You should also consider replacing this text with something that describes modular solutions but in greater detail. You should also consider replacing this text with something that describes modular solutions but in greater detail.

You should also consider replacing this text with something that describes modular solutions but in greater detail. You should also consider replacing this text with something that describes modular solutions but in greater detail.

You should also consider replacing this text with something that describes modular solutions, bu tin greater detail.

Steel Frame Solutions

Have A Question? Get in Touch


    Case Studies

    Bath Lane

    Bath Lane The project includes the construction of a 601 bedroom student accommodation development, including ancillary management and communal facilities and ground floor commercial units. The project includes the provision of associated parking, highway improvement work, amenity space and landscaping.

    bath lane

    Concord Street

    Concord Street, Leeds Concord Street is an exciting new build 9 storey apartment block in central Leeds. 35 apartments with a mix of 1 and 2-bed accommodation procured through modern, off-site construction via Frameclad.

    A very challenging site has led the design team to look at minimising time and construction activities onsite and through a full BIM approach, the coordination of architecture, structures and Frameclad has allowed careful and detailed positioning options to be looked at.

    concord street

    Case Studies

    Concord Street

    Concord Street, Leeds Concord Street is an exciting new build 9 storey apartment block in central Leeds. 35 apartments with a mix of 1 and 2-bed accommodation procured through modern, off-site construction via Frameclad.

    A very challenging site has led the design team to look at minimising time and construction activities onsite and through a full BIM approach, the coordination of architecture, structures and Frameclad has allowed careful and detailed positioning options to be looked at.

    concord street

    South Place

    South Place South Place Accommodation Go-ahead for the new four-storey development In South Place, Surbiton will create 49 one-, two- and three-bedroom homes. Set into the…

    South Place Mock Up