Replace this text with something that describes modular solutions
You should also consider replacing this text with something that describes modular solutions but in greater detail. You should also consider replacing this text with something that describes modular solutions but in greater detail. You should also consider replacing this text with something that describes modular solutions but in greater detail.
You should also consider replacing this text with something that describes modular solutions but in greater detail. You should also consider replacing this text with something that describes modular solutions but in greater detail.
You should also consider replacing this text with something that describes modular solutions, bu tin greater detail.
Steel Frame Solutions
Have A Question? Get in Touch
Case Studies
Waitrose
This uniquely shaped building designed by B&R Architects is on the site of the former Bellerby Theatre in Guildford. Main Contractor Bowmer & Kirkland were tasked with building a new Waitrose food store on the ground floor with 30 apartments and 18 affordable homes on the tapering floors above. Several of these enjoyed roof gardens which are sheltered by high parapet walls constructed from Frameclad SFS.
Think On Top Of The Box
Located in a coastal location, this was a conversion of an existing 3 storey concrete frame building into 9 townhouses. Frameclad provided the SFS infill to form new external walls to the existing levels then added a self-supporting top floor with SFS to give additional floor space to the scheme. Due to the restrictive nature of the site and the need to keep the new loadings of the upper floor to a minimum, SFS was the ideal solution for the developer.
Case Studies
Concord Street
Concord Street, Leeds Concord Street is an exciting new build 9 storey apartment block in central Leeds. 35 apartments with a mix of 1 and 2-bed accommodation procured through modern, off-site construction via Frameclad.
A very challenging site has led the design team to look at minimising time and construction activities onsite and through a full BIM approach, the coordination of architecture, structures and Frameclad has allowed careful and detailed positioning options to be looked at.
Wembley Point
Wembley Point WEMBLEY POINT Residential This prestigious project involved a full refurbishment of a reinforced concrete structure. Frameclad provided innovative light steel framing solutions to overcome…